The existing property was empty and generally in a poor state of repair. We were instructed to assist in the adaption and refurbishment to a new KFC. The project was carried out under tight time constraints as these projects always have a quick turn around from start to finish. We were heavily involved in the design, and the clients were extremely pleased the job was completed on time and to a high standard.

Our Works Included

  • Pitched roof works
  • Fitting breather membrane, under felting, 25×38 timber treated battens. Marley Ashdowne Ashurst double camber plain tiles.
  • The ridge and hips were a bespoke product and were installed with a vented dry ridge system, along with the mono ridge to surround one of the flat roofs.
  • Code 5 lead box gutter and aprons and tops to dormer windows.
  • Fibre glass dry valley system

Flat Roofs

We covered the 3 flat roofs with a felt vapour barrier, 130mm PIR insulation and covered with EPDM.

Fascia, Soffit and Gutter Works

Fascia and soffits were replaced with a black ash UPVC and a plastic deep flow gutter was installed.